Macleod Trail Corridor Planning Study

Friday, May 25, 2012

The City of Calgary is conducting a long-term transportation corridor study for Macleod Trail from 25 Avenue S. to Anderson Road. Come see the preliminary design concepts for the future Macleod Trail and provide feedback on the concepts presented at an upcoming open house.

  • June 14, 2012 at Chinook Centre – Centre Court (6455 Macleod Trail S.W.), 5 p.m. to 8 p.m.
  • June 19, 2012 at Southcentre Mall – Centre Court (100 Anderson Road S.E.), 5 p.m. to 8 p.m.



City representatives and consultants will be available to answer questions about the project. Feedback on the design concepts will be considered in the development of the recommended plans for approval. Visit calgary.ca/macleod for more information.

Currently, this section of Macleod Trail is not identified on the Transportation Infrastructure Investment Plan (TIIP) list for funding.  Corridor studies are typically completed 10 to 30 years in advance of construction to identify issues such as how much room is needed and to determine upgrades to existing roadways.  Further study is typically required before the corridor plan is implemented.  As the study progresses, we will conduct further community engagement and will be in touch with you regarding that process.

 
Best regards,
 
Mathew MacDonald, P. Eng.
Transportation Engineer
Transportation Planning
T 403.268.2196 | E mathew.macdonald@calgary.ca

 